iFIXED Remodeling and FlooringBased in Citrus Springs · serving Citrus, Marion, Sumter, Hernando, Levy + Tampa

Real work, documented honestly

See the work behind your next project.

Explore real iFIXED flooring, deck, door, kitchen, bathroom, and covered-entry work. Compare the visible scope and photo sequence, then discuss a similar project for your Central Florida property.

Completed covered entry with timber ceiling and stone columns

Explore the work

From the first repair to the final detail.

Choose a project below to compare the work involved and the photos available. Locations are shown at a broad level to respect customer privacy.

Finished craftsman front porch in Crystal River with cedar gable and stone columnsThe same house before the porch build, with the first posts going upGable rafters framed on the ground before liftingCovered entry ceiling and column detail
01 · Exterior arrival

Craftsman front porch built from framing to finish

City
Crystal River, Citrus County
Problem
The front of the house had a flat, unprotected walk-up with no shade and no visual arrival point.
Scope
Posts, gable rafter framing, roofing tied into the existing roofline, a wood ceiling, stone-clad tapered columns, and exterior paint to match.
Materials shown
Pressure-treated framing, cedar-tone ceiling boards, stacked-stone column veneer, architectural shingles, exterior paint.
Timeline
The verified photo record runs from September 13 to September 23, 2025. Exact contract start and closeout dates are not published.
Before / after
A true before photo, two framing photos, and finished views from two dates are published.
Outcome visible in the record

The gable, ceiling, and stone columns read as original to the house rather than an add-on; the entry now has shade, depth, and a defined front door.

Plan a connected renovation →

Request a similar project Link to this project

Ocala living room before: worn carpet and dated paintOcala living room after: grey LVP plank flooring and fresh white paintOcala bedroom before: worn carpet and dated paintOcala bedroom after: grey LVP plank flooring and fresh white paintOcala arched hallway before: worn carpet and dated paintOcala arched hallway after: grey LVP plank flooring and fresh white paintOcala bathroom before: worn carpet and dated paintOcala bathroom after: grey LVP plank flooring and fresh white paint
02 · Interior flooring

Whole-house paint and LVP flooring, carpet out

City
Ocala, Marion County
Problem
Worn carpet throughout, dark and mismatched wall colors, and a dated look the owner wanted reset before moving in.
Scope
Carpet and pad removal, subfloor prep, luxury vinyl plank installed through the living areas, bedrooms, hall and bath, new baseboards, and paint on walls, ceilings, doors and trim.
Materials shown
Grey wood-look LVP plank, white trim and ceiling paint, light neutral wall paint.
Timeline
The verified photo record runs from October 22 to November 26, 2025. Exact contract start and closeout dates are not published.
Before / after
Four matched same-room pairs are published: living room, bedroom, arched hallway, and bathroom.
Outcome visible in the record

One continuous floor runs through every room, the dark bedroom reads as bright and neutral, and the arch and trim lines are clean against the new paint.

“They went above and beyond, showed up on time.”

Excerpt from a public customer Google review about iFIXED flooring work.

Explore flooring installation →

Request a similar project Link to this project

Existing narrow deck stairs before replacementReplacement deck stairs and handrails after construction
03 · Outdoor living

Deck, stairs, and handrails built around usable access

City
Citrus County — Inverness, Dunnellon, Lecanto and nearby
Problem
The property needed a usable outdoor platform and a clear transition between grade and the deck.
Scope
Deck framing, stair construction, posts, guards or handrails, and connection details visible in the progress record.
Materials shown
Dimensional lumber, deck boards, posts, rail components, and exterior-rated fasteners.
Timeline
The verified photo record runs from May 1 to May 6, 2026. Exact contract start and closeout dates are not published.
Before / after
A matched pair shows the former narrow access and the replacement stairs, landing, posts, and handrails five days later.
Outcome visible in the record

The finished access is wider and more deliberate, with new stairs, a landing, posts, and handrails documented from the same side of the structure.

“Very happy with the new deck.”

Excerpt from a public customer Google review about an iFIXED deck.

Discuss a deck or outdoor project →

Request a similar project Link to this project

Interior door installation in progress
04 · Doors and carpentry

Interior door installation where alignment is the job

City
Central Florida
Problem
An interior opening needed a fitted door and finish-ready alignment.
Scope
Position and fit the door assembly, confirm operation and reveals, then prepare the opening for trim and final finish work.
Materials shown
Interior door unit, jamb or frame components, and installation hardware.
Before / after
The published image documents installation in progress, not a staged after.
Outcome visible in the record

The progress image makes the fitting and alignment work visible—the part that determines how the door operates after paint and trim.

Explore doors and trim →

Request a similar project Link to this project

Old aluminum sliding glass door seen from insideNew French doors with full-lite glass seen from inside, LVP floor installedSliding glass door on the back of the house, from the deckWhite French doors on the back of the house, from the deck
07 · Doors and carpentry

Sliding glass door replaced with French doors

City
Citrus County — Inverness, Dunnellon, Lecanto and nearby
Problem
A worn aluminum sliding door that dated the room and limited the opening.
Scope
Remove the slider and frame, prepare the opening, set and plumb a pre-hung French door unit, finish interior and exterior trim and hardware, with LVP flooring finished to the threshold.
Materials shown
Pre-hung French door unit with full-lite glass, painted trim, wood-look LVP plank.
Timeline
The verified photo record runs from August 5 to August 7, 2025. Exact contract start and closeout dates are not published.
Before / after
Two matched pairs are published: inside looking out, and from the deck looking in.
Outcome visible in the record

The opening is square, the reveals are even inside and out, and the room gained a real door instead of a track.

Explore doors and trim →

Request a similar project Link to this project

Kitchen room before the visible cabinet installationFinished white kitchen cabinet installationFinished kitchen cabinets and countertop from the sink side
05 · Kitchen cabinetry

Cabinet installation that brightens the working space

City
Central Florida
Problem
The kitchen and laundry storage needed a coordinated cabinet installation.
Scope
Install and align cabinets in the kitchen and laundry area, then coordinate the visible edges and surrounding finishes.
Materials shown
White cabinet boxes, doors, drawer fronts, and hardware.
Timeline
The verified photo sequence runs from June 17 to June 28, 2025. Exact contract start and closeout dates are not published.
Before / after
A pre-cabinet room view and two finished kitchen views document the visible change. No claim is made about work outside the photographed scope.
Outcome visible in the record

The light cabinet finish creates a clean, practical backdrop without overwhelming the room.

“It came out great!”

Excerpt from a public customer Google review about iFIXED kitchen and laundry cabinet work.

Talk through a kitchen update →

Request a similar project Link to this project

Bathroom renovation with the floor and wall cavity exposedBathroom renovation after subfloor preparation advanced
06 · Bathroom preparation

Bathroom renovation documented before the finish layers

City
Central Florida
Problem
The existing bathroom needed removal and preparation before finish work could begin.
Scope
Selective demolition and preparation of the exposed floor and wall or framing areas for the next phase.
Materials shown
Existing and exposed framing or subfloor materials plus later subfloor preparation. Final waterproofing, fixtures, tile, and finish selections are not shown or published.
Timeline
The verified preparation photos were captured June 16 and June 19, 2026. Total renovation duration is not published.
Before / after
The pair shows two verified preparation stages three days apart. A finished after photo has not been matched to this record.
Outcome visible in the record

The sequence shows removal, inspection, and subfloor preparation before finish materials can be installed.

Plan a bathroom renovation →

Request a similar project Link to this project

Planning a similar project?

Send photos of your property and the result you want. We’ll discuss the scope, materials, and next step.

Call iFIXEDGet an estimate