The Villages, Florida
Remodeling, flooring, and repairs in The Villages, done with clear answers.
Homes in The Villages are newer than anywhere else we work, so the work is updating and adapting, not fixing failures. iFIXED handles flooring, bathrooms, kitchens, doors, and repair lists, with the architectural review step planned in for any exterior work.

What iFIXED does in The Villages
Typical Villages projects are flooring replacements, bathroom updates for aging in place, kitchen and cabinet refreshes, and short repair lists.
Regulated work, such as electrical, plumbing, mechanical, or structural changes, needs the appropriate responsible contractor and its own permit. We identify those items before pricing. Plumbing-only jobs, ceiling fan installs, and furniture assembly are outside what we do.
Local housing
What we find in homes in The Villages
About 83,498 people live in The Villages. The median home was built in 2007, and 97 percent were built in 1990 or later, so these are the newest homes we work on. 93 percent are owner-occupied, and 85 percent of residents are 65 or older. Home styles include patio villas, cottage homes, courtyard villas, and designer and premier homes.
Housing and age figures: U.S. Census Bureau, American Community Survey 2020–2024 5-year estimates for The Villages census-designated place.
Local conditions
Renovating in The Villages: two approvals, two offices
The Villages is not a city. It is a census-designated place spanning Sumter, Marion, and Lake counties, governed by community development districts. The district government states that building permits are issued by the appropriate city or county building department. For the Sumter County villages, that is Sumter County Building Services at 7375 Powell Rd. in Wildwood; the City of Wildwood's own guidance confirms Sumter County issues the permits there. Villages in Marion and Lake counties and the Town of Lady Lake permit through those offices instead, so we confirm by address.
Architectural review is separate from the permit. The districts' Community Standards department runs the Architectural Review Committee, and its manual is direct: architectural approval is required for all exterior modifications unless the manual says otherwise, and the application must be approved before work starts. The ARC is administrative only; the building permit is still a separate step.
Each district has its own ARC manual, and the rules above are from District 1's. We check your district's manual before scoping exterior work and build the ARC step into the schedule, because an exterior project that skips it is the one that stalls.
Details from the Village Community Development Districts' Community Standards department and District 1 ARC manual, Sumter County, and the City of Wildwood. Requirements are set per parcel, so confirm your address before relying on any of it.
How a project starts
- Send photos and the address. One wide photo of each room or area, plus close-ups of damage or anything you want changed.
- We check the property first. Jurisdiction, flood zone, and permit needs are confirmed by address before anything is priced.
- Keep, remove, or repair. We separate what stays from what changes, and your selections from materials we source.
- A written, itemized scope. Priced by room and trade, with anything that depends on opening walls or floors listed separately.
- The work and a walkthrough. Each phase ends with a walkthrough before the next one starts.
The Villages: common questions
Does iFIXED work in The Villages?
Yes. We take flooring, bathroom and kitchen updates, doors and trim, cabinets, painting, and handyman repair work in The Villages when scheduling allows. Send the address to confirm.
Do I need ARC approval for my project?
For exterior changes, usually yes: the district manual requires architectural approval for all exterior modifications unless it says otherwise. Same-size window and door replacements, repainting in the original or an approved color, and re-shingling in the original color are listed as not needing approval. Check your own district's manual.
Does interior work need ARC approval?
The ARC manual covers exterior modifications. Interior work such as flooring, kitchens, and bathrooms still needs any required building permit from the county or city.
Who issues building permits in The Villages?
The county or city building department for your address. For the Sumter County villages, that is Sumter County Building Services in Wildwood. Villages in Marion and Lake counties and Lady Lake permit through those offices.
How long does ARC approval take?
The ARC meets every Wednesday, and results post the Friday after the meeting. An approval is valid for 9 months, with one extension. We build that step into the schedule for exterior work.
Can you make my bathroom safer?
Yes. Grab-bar blocking, a lower shower threshold, slip-resistant flooring, and lever handles are the most common bathroom upgrades we plan in The Villages.
How much does a small repair list cost?
Flat-rate handyman blocks: $395 for a half day (4 hours) or $695 for a full day (8 hours).